Publication type: Academic Journal Article
The generation and processing of waste electrical and electronic equipment (WEEE) has given rise to numerous challenges and accordingly preventive approaches, due to governmental and environmental regulatory pressure. Yet, main requirements and practices are standard between different countries. This paper investigates the facilities of WEEE processing using a German case study, as grounded in EU legislature. This case study was compared to another case study in Serbia, with different processing steps and requirements. The facilities available in both countries were assessed to report contrasts between the two. Furthermore, the data requirements and standardisation approaches are briefly outlined as part of recommendations for implementation in WEEE facilities for processes, standardisation and optimisation based on identified gaps in Serbia WEEE data management.
This website provides reference information on reports, articles, and other publications related to EPR. Where possible, links to the original source are provided. Copies of the actual publications are not maintained in the reference database because the publications may be copyrighted or otherwise protected by the publishing source or author. Follow the link to the original document and/or contact the publisher/author for more information.